Activating this section allows for segregation between the office space planning requirements (Rs) and objectives (Os) and equipment spatial Rs and Os. For the Issue 4 release, the section is activated and renamed as “Equipment Spatial Design Requirements for Frames and Chassis”. In the Issue 3 release of 2006, this section was deleted from the document and was left dormant. Going back to the Issue 2 version of the specification in 2002, Section 3 was a look forward to generic framework requirements. The first change you will notice is the reactivation of Section 3. It has been six years since the document was updated and, as in previous releases, the specification has numerous technical changes. Telcordia recently released GR-63-CORE Issue 4 “Physical Protection Requirements for Network Telecommunications Equipment”, with a total of 27 new requirements (Rs) and objectives (Os).